❌

Normal view

Yesterday β€” 13 May 2026Main stream

NVIDIA Drains Foxconn’s Entire CPO Rack Supply Ahead of Schedule, Forcing the Assembler to Skip Showcase at Computex This Year

13 May 2026 at 18:35

Multiple yellow cables connected to the back of an NVIDIA server/network device with several ports and connectors visible.

Foxconn has reportedly shipped the entirety of its Co-Packaged Optics racks to NVIDIA as it quintuples its shipment estimates for 2026-2027. You May Not Be Able To Find Any Foxconn Co-Packaged Optics Rack At Computex, As The Entire Supply Is Shipped To NVIDIA NVIDIA is accelerating its co-packaged optics development ahead of the Feynman launch in 2028. The next-gen CPO racks solve major infrastructure connectivity & scale-out bottlenecks with AMD all-in on the race too. As per rumors in the Taiwanese industry, Foxconn has apparently shipped all of its CPO racks to NVIDIA ahead of schedule. NVIDIA is Foxconn's major […]

Read full article at https://wccftech.com/nvidia-drains-foxconn-entire-cpo-rack-supply-ahead-of-schedule/

❌
❌