❌

Reading view

NVIDIA Drains Foxconn’s Entire CPO Rack Supply Ahead of Schedule, Forcing the Assembler to Skip Showcase at Computex This Year

Multiple yellow cables connected to the back of an NVIDIA server/network device with several ports and connectors visible.

Foxconn has reportedly shipped the entirety of its Co-Packaged Optics racks to NVIDIA as it quintuples its shipment estimates for 2026-2027. You May Not Be Able To Find Any Foxconn Co-Packaged Optics Rack At Computex, As The Entire Supply Is Shipped To NVIDIA NVIDIA is accelerating its co-packaged optics development ahead of the Feynman launch in 2028. The next-gen CPO racks solve major infrastructure connectivity & scale-out bottlenecks with AMD all-in on the race too. As per rumors in the Taiwanese industry, Foxconn has apparently shipped all of its CPO racks to NVIDIA ahead of schedule. NVIDIA is Foxconn's major […]

Read full article at https://wccftech.com/nvidia-drains-foxconn-entire-cpo-rack-supply-ahead-of-schedule/

❌